Dipl.-Ing. Michael Herrmann
February 14, 2023
•
Consulting
•
2011-2020
Senior Business Consultant - Insolvency processing, supplier relocation, sampling,
process restarts, supplier development, process optimisation.
Insolvency handling with relocation of 125 plastic injection moulding tools for approx. 250
component part numbers incl. colour batches for series & ET requirements in all model series & derivatives
of Mercedes Benz worldwide (China, USA, Mexico, South Africa, India, Hungary, Germany, ...).
Acoustic parts, wheel arch linings, battery protection caps, high voltage protection caps, grained
interior trim parts (A-/B-/C-pillar), luggage compartment trim and small parts made of the
specified materials: PA 6 & PA 6.6 GF..., PP, PE, PS, PVC
Machines: Injection moulding machines from 100 t to 1500 t clamping forces.
1. supplier development at the successor supplier according to VDA 6.3 (upgrade 2016)
2. preparation for IATF 16949
3. creation and adaptation of quality management manual
4. implementation of a quality management system according to VDA standard
5. adaptation of process and procedure instructions, test and control plans
6. creation of tool life cycles, parts life cycles
7. change management
8. product and process FMEAs
Accumsan semper euismod dolor vitae metus.
Etiam volutpat ligula nec orci egestas, at porta massa tempor. Proin rutrum, purus in convallis pharetra, risus leo sagittis.