Dipl.-Ing. Michael Herrmann
February 14, 2023
•
Task Force
•
2021+
Task Force Management - Piston Pressure Accumulator Hybrid Transmissions Audi AG
OEE / Process & Supplier Management / SCM & TPM
OEE increase in semi-finished products and piston pressure accumulator assembly island from 60% to 85%
Weak point analysis of semi-finished products, raw materials for end product
Maintenance activities TPM from reactive to preventive
a. scrap reduction from >7% to </= 2%
b. improvement of OEE from 60% to 80-85%
c. OEM - call-off quantities good parts in 15 instead of 16 shifts
d. TPM reactive to preventive
1) Traceability of material properties of round blanks for the process chain
2) Mapping of material history of round blanks
3) TPM ==> Coolant lubrication system rolling process / JENOPTIK / Coolant overflow with sensor protection / Clean room island
4) Creation of a defect catalogue of round blanks (semi-finished products)
5. ) Packaging circuit (external & clean circuit)
6.) OEE piston pressure accumulator
7.) Process optimisations, quality analyses, packaging circuits
8.) Mapping of tool life (mandrel, rollers, bearings) - change intervals
9.) Optical inspection - JENOPTIK (surface inspections)
Accumsan semper euismod dolor vitae metus.
Etiam volutpat ligula nec orci egestas, at porta massa tempor. Proin rutrum, purus in convallis pharetra, risus leo sagittis.